Voltie eV charger
EV charger by Voltie. Compatibility with energy supplier apps, Home Assistant and evcc.
evcc gives no model name for this entry; the name above is derived from the brand and device type.
At a glance
| Device type | EV charger [evcc template, 2026-10-19] |
|---|---|
| evcc support | Yes |
| Connection | Modbus TCP (inferred from evcc template parameters) [evcc template, 2026-10-19] |
| Local control (no cloud) | Yes via evcc's connection type [evcc template, 2026-10-19] |
| Home Assistant | Unknown know this? tell us (brand not yet checked) |
| Known firmware notes | Phase switching is only available on chargers manufactured from 2026 (serial number starting with 1026). From firmware 357 evcc reads the capability from the charger and only offers phase switching where it is supported. [evcc template, 2026-10-19] |
Energy supplier apps
Supplier lists are published per brand (sometimes with model conditions). A brand match does not guarantee your exact model works — check the linked page or the supplier's app.
| Supplier / service | Status for Voltie charger | Source |
|---|---|---|
| Frank Energie | Not listed Voltie is not on Frank Energie's EV-charger list | [source, 2026-10-19] |
| Tibber | Not listed Voltie is not on Tibber's EV-charger list | [source, 2026-10-19] |
| Zonneplan | Not listed Zonneplan only lists its own hardware | [source, 2026-10-19] |
| Eneco | Unknown know this? tell us | — |
| ANWB Energie | Unknown know this? tell us | — |
| Vattenfall | Unknown know this? tell us | — |
Home Assistant integrations for Voltie
Unknown know this? tell us — we have not yet checked Home Assistant support for Voltie.
evcc details
| Template | voltie (charger) [source, 2026-10-19] |
|---|---|
| Connection | Modbus TCP (inferred) |
| Capabilities | mA1p3pmeterdim [source, 2026-10-19] |
| Requirements | Modbus must be set to "TCP" on the Modbus config screen of the Voltie app, and the slave address configured there (default 11) must match the ID. The communication timeout reduces the charging current to 0 A after a loss of communication, so it has to be set to 0 (disabled) or to a value larger than the evcc update interval. [source, 2026-10-19]evcc sponsor token required |
| Known caveats | The charger's auto start mode is disabled persistently when evcc starts and has to be switched back on in the Voltie app after evcc is removed. The Modbus TCP gateway forwards at most two transactions per second. Shorter polling intervals produce timeouts rather than fresher data. Phase switching is only available on chargers manufactured from 2026 (serial number starting with 1026). From firmware 357 evcc reads the capability from the charger and only offers phase switching where it is supported. [source, 2026-10-19] |
“Works for me” reports
No user reports yet. Report your firmware version and setup TODO: form
Where to buy
Shop links will appear here. TODO: affiliate placeholder — no links yet See our affiliate disclosure.